Ansel™ PANELS
For a formal PDF quote please contact:
206.788.4210 or info@modulararts.com.
Most of our designs are made to order and typically ship in 3 - 10 business days.
Orders over 50 panels may require additional lead time.
Pallet jack or forklift recommended at receiving end.
Commercial Grade, 32" by 32" by 1.5"
Glass Reinforced Gypsum w/lightweight core.
Class A, NFPA 286 PASS
Steel reinforced joints.
Alignment tabs ensure accurate surface alignment.
Product Cut Sheet (PDF)
Product Specifications (PDF)
Product Specifications (DOC)
PANEL CALCULATOR
Determine what you need for your space.
PANEL INSTALLATION
• PANELS must be screw mounted through the face directly to the substrate, typically drywall. Panels are not attached to studs.
• All panel-to-panel edges are glued with approved adhesive as panels are mounted. The backs are not glued, only the panel edges.
• Seams are filled with the approved spackling compound.
• Seams are sanded.
• Surface is sealed with the approved primer/sealer.
• Desired finish paint is applied. Flat paint is recommended, and spray application provides the best results.
To perform the installation of modularArts panels, we recommend that a finish carpenter or millworker mount and edge-glue the panels, and a drywall tradesperson address the seams.
One man-hour per panel should be allowed to bring the installation to a paint-ready state. Drying time of adhesive is not included. Adhesive requires 24 hours to dry. Experience may certainly shorten labor time!
A detailed Instruction Booklet will come with the panels.
Installation Kit Contents
• APPROVED DRY MIX JOINT COMPOUND
• APPROVED ACRYLIC FORTIFIER
• APPROVED CONSTRUCTION ADHESIVE
(for bonding panels edges together during install)
• COUNTERSINK DRILL BIT
• MUDTOOLS Soft Flex Spreader
• SANDPAPER (various grits for seam finishing)
• PLASTIC CONTAINER
• MEASURING CUP